The project objective is to provide know how detail design and main equipment delivery of Coke Removal Unit (CRU) for removing of coke from quenchwater in ethylene plant (EP) in the project J3 in Jamnagar, Rajasthan, India. CRU is a part of a newly built petrochemical plant in the Western part of India located on the Indian Ocean coast.
Environmental protection requirements for oil drilling from the seabed are constantly increasing. Our company has responded with projects for construction and supply of atmospheric oily water separator, which is intended for use on drilling platforms. Our projects were implemented on drilling platform. Their last generation drilling platform is equipped with the latest technologies and is one of the largest yet built facilities of its kind.
The project objective was a modernization of coagulation wastewater treatment facility to increase the maximum volume of wastewater.
The objective of the projects was the installation of new fans as a replacement of the existing compressors in the Station for Acid Solutions Liquidation – 1st stage (SASL I) unit in Diamo, o.z. TÚU, a state company, Stráž pod Ralskem.
Legislative emission limits of solid substances emitted to the ambient are constantly decreasing. Our company designed and installed technology for solid coke particles removal from the steam-air mixture during the furnace decoking including two inlet nozzles of different sizes and unique Coke Separation Chamber. Guaranteed emission rate is 20 mg/Nm3.
Design and procurement of a filtration unit for the quench oil loop. The filtration unit removes solid coke particles without any necessity for shutdown of the ethylene plant (EP), with no negative impact to the environment and to health and safety.
Environmental protection requirements for oil drilling from the seabed are constantly increasing. Our company has responded with projects for construction and supply of atmospheric oily water separator, which is intended for use on drilling platforms. This process will be installed on drillships.
This project consisted of production and assembly of a new tank with a volume of 360 m3, which is a part of waste water treatment in ČESKÁ RAFINÉRSKÁ, a.s.
Design and procurement of a filtration unit for the quench oil loop. The filtration unit removes solid coke particles without any necessity for shut down of the ethylene plant (EP). This system of filtration is the unique process, especially with respect to discharge of dry coke from the filters, with no negative impact to the environment and to health and safety. The process is designed and owned by Intecha.
Design and installation of the process of automatic dewatering system for four gasoline storage tanks in Recope refinery in Costa Rica.