Execution Time |
from: 05/1997
to: 05/1998 |
Execution Stage |
Documentation for Building Permit
Detail Design
Lump Sum Turn Key
|
Client | ECK Generating s.r.o., Kladno |
The project solved an unacceptable state of the unloading of chemicals for chemical treatment of water from rail tank cars and its storage.
A new unloading station for chemicals from rail tank cars was constructed, a new storage facility with a total capacity of 2 x 80 m3 NaOH, 2 x 80 m3 HCl a 2 x 40 m3 Fe2(SO4)3 and piping connections from the unloading station to diluted tanks in WTP were constructed.