Execution Time |
from: 2012
to: 2013 |
Execution Stage |
Detail Design
|
Client | RWE Gas Storage, s. r. o. |
Safely isolation of technology in each underground gas storage from the transit gas pipeline.
Installation of limit valves was one of the conclusions of a safety study and a HAZOP.
The project found a location, where to install those valves and designed their connection to the control system of the UGS.