Execution Time |
from: 05/2013
to: 10/2014 |
Execution Stage |
Documentation for Building Permit
Detail Design
|
Client | RWE Gas Storage, s. r. o. |
This project background is to increase the Underground Gas Storage Dolni Dunajovice storage capacity, of the gathering centers SS1 and SS2.
To increase a number of the connected wells for injection and withdrawal which is under consideration requires of reconstruction of interconnecting piping, metering lines, liquid separation from gas. They were the basis for this project.
New building, Instrument Air supply and DCS modifications, installation of GDS and FDS were included in this project as well.
The project engineering consisted from Detailed Design and Building Permit documentation.
Follow up activities were provided for the client, e.g. dealing with state authorities and on-site supervision.