A NEW PILOT FACILITY

Execution Time from: 05/2018
to: 09/2018
Execution Stage
Study
Client Cray Valley Czech s.r.o.
 

The aim of the study was a new pilot facility design of Krasol LBH 2000 production.

The study also included the design of a new building for offices, control room, master room and social facilities.

The new pilot facility was located in the open area next to the liquid rubber production plant of Cray Valley Czech s.r.o. in Kralupy nad Vltavou.