Execution Time |
from: 01/2011
to: 06/2011 |
Execution Stage |
Documentation for Building Permit
Detail Design
|
Client | SYNTHOS Kralupy a.s. |
The aim of the project was to construct a unit for destabilization of butadiene, to increase the storage capacity of waste hydroxide and to modify the existing process equipment for blending of required concentrations of hydroxide. Removal of the stabilizer of butadiene is carried out by washing in a NaOH solution.