HIGH PRESSURE STEAM PRESSURE REDUCING STATIONS

Execution Time from: 06/2002
to: 08/2003
Execution Stage
Lump Sum Turn Key
Client CHEMOPETROL, a.s.
 

Replacement and reconstruction of pressure reducing stations for high pressure steam for a capacity of 200 t/h approximately and parameters p=11.9 MPa; t=520 0C, including the associated piping connections.

The complete replacement and reconstruction of pressure reducing stations for high
pressure steam were carried out during a 37 day shutdown of the ethylene plant.

The project was executed as a turnkey project from preparation of the detailed design of the high pressure steam pipeline to commissioning and start-up.

video