Execution Time |
from: 12/2013
to: 05/2015 |
Execution Stage |
Lump Sum Turn Key
|
Client | UNIPETROL RPA, s.r.o. |
The scope of the project was all necessary engineering activities and project execution as “ Lump Sum Turn Key Job”.
Engineering activities:
Project execution:
LPG rail tank unloading was designed by using compressor with a capacity 33-64 t/h. Recuperation of remaining vapour is provided by compressor after the liquid LPG is unloaded.
The LPG unloading capacity is 6 rail tanks per day and 100000 t/year.