LPG RAIL TANKS UNLOADING

Execution Time from: 12/2013
to: 05/2015
Execution Stage
Lump Sum Turn Key
Client UNIPETROL RPA, s.r.o.
 

The scope of the project was all necessary engineering activities and project execution as “ Lump Sum Turn Key Job”.

Engineering activities:

  • Planning Permit
  • Building Permit
  • Final Inspection Approval obtaining from state authorities

Project execution:

  • Civil construction works
  • New LPG unloading points
  • New unloading arms and accessories
  • Piping connections
  • Control system
  • Reconstruction of the electrical substation
  • Replacement of all valves including installation of remote-controlled valves
  • Complete field instrumentation revamp

LPG rail tank unloading was designed by using compressor with a capacity 33-64 t/h. Recuperation of remaining vapour is provided by compressor after the liquid LPG is unloaded.

The LPG unloading capacity is 6 rail tanks per day and 100000 t/year.