Execution Time |
from: 04/2008
to: 12/2008 |
Execution Stage |
Documentation for Planning Permit
Documentation for Building Permit
|
Client | UNIPETROL RPA, s.r.o. |
On the basis of a process of production of technical dicyclopentadiene (DCPD) and nonhydrogenated C9 fraction developed by UNIPETROL RPA in cooperation with ICT Prague, Intecha elaborated the entire set of documentation required to obtain building permit. The documentation included:
• Documentation of Environmental Impact Assessment (EIA)