RECONSTRUCTION OF HIGH PRESSURE STEAM PIPELINE IN ETHYLENE PLANT

Execution Time from: 08/2005
to: 11/2007
Execution Stage
Lump Sum Turn Key
Client CHEMOPETROL, a.s.
 

Design and execution of new high pressure steam piping.

The replacement was made during a shutdown – installation and reconnection of prefabricated parts.

Process Intecha.

video