REPLACEMENT OF COOLING COMPRESSORS

Execution Time from: 08/2012
to: 05/2013
Execution Stage
Lump Sum Turn Key
Client UNIPETROL RPA, s.r.o.
 

Replacement of cooling compressors K300 A/B/C by a pair of new cooling units, each of power rating of 720 kW. The cooling unit consists of screw compressors, a high pressure collector of the cooling fluid, air condensers and evaporators.

The project consisted of construction of new buildings – a compressor house, a slop tank, procurement and construction of a steel structure, an air-conditioning system, a motor control room for equipment, a new control system for the new cooling units including implementation to the existing control system, procurement and assembly of new piping connections including a new pipe rack, electro and instrumentation installations.