Execution Time |
from: 10/1998
to: 10/1999 |
Execution Stage |
Study
Basic Design
Documentation for Building Permit
Lump Sum Turn Key
|
Client | CHEMOPETROL, a.s. |
The reconstruction of two process lines of the "Gasification of the heavy fuel oil" production unit was based on gradual reconstruction of both process lines of the "process gas wash" without any shut down of the production.