Execution Time |
from: 09/1995
to: 10/1998 |
Execution Stage |
Documentation for Building Permit
Documentation for Planning Permit
Study
Detail Design
|
Client | Kaučuk, a.s. |
Construction of a new unit for the production of styrene with a capacity of 130 000 tons of styrene–monomer per year.
A part of the project was also an OFF-SITE part, which included extensive replacement of piping in the pipe racks, modification of the storage of the liquids, reconstruction of the flare system, and reconstruction of the control room building.
Intecha prepared documentation for planning permit for the entire construction site and a study of all the OFF-SITE parts. Intecha further executed reconstruction of Fl-2 flare including the liquid seal. Intecha prepared for the main contractor of the construction a project for building permit and a detailed design project in all the professions for the OFF-SITE part, and it further carried out on-site supervision for this part of the project.