Execution Time |
from: 09/2015
to: 10/2016 |
Execution Stage |
Basic Design
Detail Design
Documentation for Building Permit
Lump Sum Turn Key
|
Client | UNIPETROL RPA, s.r.o. |
The purpose for the execution of the investment project "Increase in ZC9 Production" is to increase the C9 + fraction production on the ethylene unit by installing new reactors for dimeration of unsaturated C5 and C6 hydrocarbons.
This technology will increase the ZC9 fraction production used to produce diesel oil. At the same time there will be reduced the proportion of unsaturated C5 hydrocarbons entering the ethylene unit technology.