Execution Time |
from: 02/2010
to: 09/2010 |
Execution Stage |
Lump Sum Turn Key
|
Client | ČESKÁ RAFINÉRSKÁ, a.s. |
The goal of the project was to enable dispatch of ETO (diesel with addition of a dye) without FAME via the road terminal in Kralupy.
For dispatch of ETO a new pump was installed, which can be operated manually or remotely. The project execution also included necessary modifications of the piping systems.