Execution Time |
from: 03/2011
to: 11/2011 |
Execution Stage |
Detail Design
Lump Sum Turn Key
|
Client | ČESKÁ RAFINÉRSKÁ, a.s. |
The objective of this project was to disassemble, relocate and assemble an existing absorber and its modification in order to remove HCl from waste gas from CCR. The adsorber is packed with aluminum balls of various sizes.