Execution Time |
from: 01/2008
to: 12/2008 |
Execution Stage |
Lump Sum Turn Key
|
Client | ČESKÁ RAFINÉRSKÁ, a.s. |
Unloading facility with seven unloading arms, a pump station, a control room, a railway siding and piping connections to storage tanks was built to increase the capacity of unloading primary naphtha.
The project was executed as a turnkey project including preparation of documentation in all stages.