NEW COMPONENTS OF BA BLENDER – ETBE, ALKYLATE

Execution Time from: 12/2011
to: 10/2012
Execution Stage
Lump Sum Turn Key
Client ČESKÁ RAFINÉRSKÁ, a.s.
 

Enable application of ETBE and alkylate as a new full inlet to gasoline blender and to enable adding of alkylate to gasoline without any restrictions for blending of reformate.

For blending of ETBE, a new blending pump and a new blending line with a control loop were installed.

Existing pumps were used for blending of alkylate. In the scope of this project, a new suction line was constructed, and the discharge piping were modified by installation of new recirculating valves for minimal flow through the pump.