Execution Time |
from: 08/2012
to: 09/2013 |
Execution Stage |
Basic Design
Detail Design
Lump Sum Turn Key
|
Client | ČESKÁ RAFINÉRSKÁ, a.s. |
This project consisted of production and assembly of a new tank with a volume of 360 m3, which is a part of waste water treatment in ČESKÁ RAFINÉRSKÁ, a.s.