REPLACEMENT OF EQUALIZATION TANK

Execution Time from: 08/2012
to: 09/2013
Execution Stage
Basic Design
Detail Design
Lump Sum Turn Key
Client ČESKÁ RAFINÉRSKÁ, a.s.
 

This project consisted of production and assembly of a new tank with a volume of 360 m3, which is a part of waste water treatment in ČESKÁ RAFINÉRSKÁ, a.s.

 A part of the project was also disassembly of the existing tank, including reconstruction of the foundations, modification of piping and installation of new lighting. The equalization tank is used to retain salty and oil contaminated waste
water flowing from distributing pit.