Execution Time |
from: 01/2014
to: 05/2014 |
Execution Stage |
Basic Design
|
Client | ČESKÁ RAFINÉRSKÁ, a.s. |
The aim of this project was a store tank replacement including a reconstruction of tank foundation with regard to environmental protection, naphtha piping modification in the pumping station and supply piping of the tank.
The tank has a volume 31 573 m3 and is used to store petrol, in alternative diesel.
It is an open tank with a floating pontoon type roof, equipped with a spiral staircase and entrance on the floating roof by a movable ladder. Roof drainage is performed by articulated piping.