The goal of the project was to ensure the safe separation of above-ground process parts of UGS in the Distributed Center 1 from the sources of gas in case of emergency (accident, fire, gas leakage, loss of equipment integrity, etc.), and then safely emergency depressurize all the high pressure equipment.
Safe emergency depressurization design of the pressure technology in case of emergency situation in each area of the underground gas storage.
The goal of the project was to ensure the safe separation of above-ground process parts of UGS Dolni Dunajovice in the Central Area and the Distributed Center 3 from the sources of gas in case of emergency (accident, fire, gas leakage, loss of equipment integrity, etc.), and then safely emergency depressurize all the high pressure equipment.
This project background is to increase the Underground Gas Storage Dolni Dunajovice storage capacity, of the gathering centers SS1 and SS2.
Safely isolation of technology in each underground gas storage from the transit gas pipeline.
The project solved relocation of control rooms and instrumentation control rooms to newly reconstructed buildings further from the technology.
The objective of the project was to modify above-ground technology of the Underground Gas Storage in connection with installation of a new filling compressor for natural gas.