Development of the Conceptual Engineering/Feasibility Study, which will provide an optimal and viable technological solution for the new Wastewaters Treatment Plant of waste waters coming from the crude oil treatment process of EPEP Centro, which allows to disposed the treated waste water into the sea.
The aim of the project is to modernize the technology of oily water treatment and to centralize these treatment units into one area in the area of Chempark Záluží of the ORLEN Unipetrol RPA s.r.o.
The objective of the project was the design, fabrication, procurement and implementation to the existing control system of 2 automatic dewatering units for 4 storage tanks. Each tank volume is 30 000 m3, and the products storage are naphtha, gasoline, diesel and hexane of the ethylene plant in Nizhnekamsk, Russia – Tatarstan.
Environmental protection requirements for oil drilling from the seabed are constantly increasing. Our company has responded with projects for construction and supply of atmospheric oily water separator, which is intended for use on drilling platforms. Our projects were implemented on drilling platform. Their last generation drilling platform is equipped with the latest technologies and is one of the largest yet built facilities of its kind.
The project objective was a modernization of coagulation wastewater treatment facility to increase the maximum volume of wastewater.
This project consisted of production and assembly of a new tank with a volume of 360 m3, which is a part of waste water treatment in ČESKÁ RAFINÉRSKÁ, a.s.
Design and installation of the process of automatic dewatering system for four gasoline storage tanks in Recope refinery in Costa Rica.
Environmental protection requirements for oil drilling from the seabed are constantly increasing. Our company has responded with projects for construction and supply of atmospheric oily water separator, which is intended for use on drilling platforms. This process will be installed on drillships.
The contract included design and installation of the process of automatic dewatering system for four JET A1 tanks in the NICO LÓPEZ refinery in Cuba.
The contract included six projects in total. One of them was executed before the shutdown. For the remaining projects, prefabrication was carried out at the end of 2008 and the beginning of 2009. Final assembly was executed during the shutdown of Kralupy refinery.