Execution Time |
from: 03/2019
to: 07/2019 |
Execution Stage |
Detail Design
|
Client | Cray Valley Czech s.r.o. |
The aim of this detail design documentation for investment job „Piping lines modification“ was to design necessary modifications in the process, mechanical, electrical, instrumentation and civil part to supplement the existing process equipment with the production of a new product „Ricon 100“ (liquid copolymer of butadiene and styrene).
All process equipments, both existing and new ones, were recalculated for the newly manufactured product – „RICON 100“.