Storages, Loading and Unloading, VRU, ATD

TANK MODIFICATION

The aim of this project was to increase the butadiene storage capacity and to build a new line for the butadiene transport from the Liquefied Gas Storage Facility to the Chemical Production Area (CHPA).

 

THE FB-103 TANK INSTALLATION AT ETHYLENE UNIT

Demolition of original Tank FB-103 was executed due to the fact that the tank was in a significantly corroded state and it could not be used to storage of hydrocarbons. It was replaced by a new tank intended as a feed tank for primary naphtha to pyrolysis furnaces.

 

TANK RECONNECTION

This project was carried out in the storage of feed liquids for cracking furnaces at the ethylene plant in UNIPETROL RPA, s r.o. area.

 

AVIATION FUEL JET-A1 PRODUCTION

The aim of this project was an introduction of aviation kerosene production in JET-A1 quality at ČESKÁ RAFINÉRSKÁ, a.s. in refinery Litvínov. The subject of elaborated documentation was JET-A1 storage, filtration and expedition design.

 

LPG RAIL TANKS UNLOADING

The scope of the project was all necessary engineering activities and project execution as “ Lump Sum Turn Key Job”.

 

AUTOMATIC DEWATERING OF STORAGE TANKS

The objective of the project was the design, fabrication, procurement and implementation to the existing control system of 2 automatic dewatering units for 4 storage tanks. Each tank volume is 30 000 m3, and the products storage are naphtha, gasoline, diesel and hexane of the ethylene plant in Nizhnekamsk, Russia – Tatarstan.

 

TANK TSA EXCHANGE

The aim of this project was a store tank replacement including a reconstruction of tank foundation with regard to environmental protection, naphtha piping modification in the pumping station and supply piping of the tank.

 

REPLACEMENT OF EQUALIZATION TANK

This project consisted of production and assembly of a new tank with a volume of 360 m3, which is a part of waste water treatment in ČESKÁ RAFINÉRSKÁ, a.s.

 

AUTOMATIC DEWATERING OF STORAGE TANKS

Design and installation of the process of automatic dewatering system for four gasoline storage tanks in Recope refinery in Costa Rica.

 

BENZENE UNLOADING FROM RAIL TANK CARS

The objective of the contract featured construction of a new unloading station for benzene to use as feedstock from external sources and to increase the existing capacity of Ethylbenzene II production plant in the area of UNIPETROL RPA, s.r.o., steam cracker.